Mondial House - The End
Mondial House closed in February 2006
"UBS will be allowed to demolish Mondial House next to Cannon Street station, in order to build its huge Watermark Place project. The development will provide 545 000 square feet of office and retail space."

February 2006 and Mondial House is boarded up, awaiting redevelopment...

Photo © utgarthr

| EXIT | Scene at Mondial House | The Plans | The Demolition | Death of a Building | The Darkest Times |
Scene at Mondial House

Check the Scene at Mondial House (photos) from February 2006.

The Plans

Here's an extract from the notes of the planning meeting with the Mayor of London on 15th December 2005:

Design issues

24 Mondial house is a bold piece of architecture, but unloved and cannot be usefully put to another purpose without the kind of wholesale redevelopment envisaged in this application. It is also an obstacle to the appreciation of the towers and abutments of Canon Street Station which are listed buildings. The design of Mondial House was reduced in height and set back late in the design stage to accord with the St Paul's Heights Limitations policy but is still visible over the threshold. Mondial House also overhangs the river walkway, is taller than Canon Street and has an oppressive impact on Angel Passage next to it.

25 This proposal, which seeks to demolish the majority of the building replacing it with two blocks, will enable a greater appreciation of the listed buildings and will provide a more considered response to the challenge presented by the St Paul's Heights Limitations policy area. The new design will address these issues by setting back the building lines. It will also include a new 'L' shaped pedestrian thoroughfare that will provide valuable circulation space on the river walkway and is a significant design benefit. Retail type uses at ground floor level will enliven the public realm making the new open space more pleasant and safe.

26 The new buildings have been designed to respect the St Paul's Heights Limitations and the cones of the strategic viewing corridors described in RPG3A. The proposal is for two buildings facing the river using a third of the existing structure of Mondial House. This will provide one 'L' shaped buildings and another small, square, stand alone building. The L shaped building is set further back from the line of the river and is also set back from its current flank building line to make Angel Passage wider. The impression is given that the 'L' shaped building is two buildings because the upper levels facing Upper Thames Street form a coherent office block that can be read as a single building. Those parts of the building facing the Thames are lower than the abutments of the Canon Street Station and designed to respect the building height thresholds in place.

The full document [stage1report .pdf] can be downloaded or more details found at www.london.gov.uk

The Demolition

Update
		  1 - Demolition in progress...
 September 2006 and demolition is well underway.

Leon Baird gives us a photographic update from the site...

Photo © Leon Baird 2006


Mondial House - Death of a Building - A photomontage
Mondial House
		  - Photomontage - Death of a Building
A photomontage of some key shots.

Photo © Leon Baird 2006


The Darkest Times
The Darkest
		  Times

December 2006

With twisted rods of metal protruding from broken piers of concrete, as an all enveloping cloud of darkness hangs over the once great fortress that was Mondial House...

Photo © Leon Baird 2006

Mondial House Uncovered
Mondial House
		  Uncovered
As the demolition continues we take a detailed look at the site and the many sub levels which made up this fascinating building.