| Thames B (Phase 2) | |
|
The Thames ISC was installed in two stages which were officially known as: |
| EXIT | Thames B (Phase 2) | Inspecting an AKE Switch | |
|
Thames B (Phase 2)
Thames 2 TXK6 used the Ericsson AKE13 SPC controlled codebar switching system. SPC was necessary to support the CCITT6 common channel signalling system. It had a capacity of 5000e. The last analogue ISC to survive – it was withdrawn in 1992.
Inspecting an AKE switch:
|
|
|
|
*Peter Walker was the project manager for Thames (extension) and Keybridge in 1981/2.